24/7 Traffic Control – Culvert Replacement
Black Fox Safety & Security Services Ltd. successfully provided continuous, around-the-clock traffic control services in support of a culvert replacement project. Our team ensured safe vehicle movement, worker protection, and uninterrupted project operations throughout the entire duration.
Traffic Control Operations
A dedicated team of 4 certified Flaggers was deployed to manage traffic flow 24/7 for 14 consecutive days. Responsibilities included:
Maintaining safe and orderly vehicle movement through the active construction zone
Coordinating closely with the construction team to adapt to changing site conditions
Ensuring clear communication and safe passage for all road users
Traffic Volume & Road User Management
The project area experienced an average daily traffic volume of approximately 500 vehicles, consisting of:
Oversized commercial units
Heavy industrial loads
Passenger vehicles and light-duty traffic
Our team maintained consistent control through all traffic types, ensuring safety and minimizing delays for the traveling public.
Project Outcome
The culvert replacement was completed safely and efficiently with zero traffic-related incidents. Continuous 24/7 flagging ensured worker protection, maintained compliance with traffic control standards, and kept vehicles moving through the construction zone without disruption.

